Daily News
Project Acronym: IDDP-1 | State: Completed | Expedition ID: 5029
ins.: 2008-11-23 01:00, 17 yrs ago

Category:
IDDP_

IDDP: 2008-11-23
The drill bit came up onto the drill floor around ...

The drill bit came up onto the drill floor around noon yesterday. Two borehole logging runs were carried out until 5:30 PM yesterday afternoon after the dismantling the BHA was finished. First was the temperature of the wellbore measured, and thereafter was the caliper log run downhole. During the night work had continued with casing the hole. The 24½" intermediate casing segments are being welded together and this morning the fifth pipe was being welded to the casing string. Running the entire casing string downhole is expected to take all day.
- Links:
- /fileadmin/icdp/projects/data/iddp/2008_11_23/DIS_OTHER.htm