Skip to main content

Daily News

Project Acronym: IDDP-1 | State: Completed | Expedition ID: 5029

ins.: 2008-11-23 01:00, 17 yrs ago
By: Scientists
Category: IDDP_
IDDP_

IDDP: 2008-11-23

The drill bit came up onto the drill floor around ...
The drill bit came up on drill floor around noon yesterday. A bit of mud had accumulated on the bit as well as the stabilizers, but otherwise was the bit condition good, there were no broken teeth or severe marks of wear and tear.

The drill bit came up onto the drill floor around noon yesterday. Two borehole logging runs were carried out until 5:30 PM yesterday afternoon after the dismantling the BHA was finished. First was the temperature of the wellbore measured, and thereafter was the caliper log run downhole. During the night work had continued with casing the hole. The 24½" intermediate casing segments are being welded together and this morning the fifth pipe was being welded to the casing string. Running the entire casing string downhole is expected to take all day.