Project Acronym: IDDP-1 | State: Completed | Expedition ID: 5029

ins.: 2009-04-25 02:00, 16 yrs ago
By: Scientists
Category: IDDP_
IDDP_

IDDP: 2009-04-25

Sleeves in the pumps were changed last night to 6” ...
Temperature logging 24th of April, while attempting to loose fish. A crane is necessary to get the tool into the pipe which is some 6-7 m above the derrick.

Sleeves in the pumps were changed last night to 6” and after that up to 65 L/s have been pumped through the string at 225 bar pressure, while pulling with up to 250 tonne for 5 minutes and activating the jar in between. There have been small signs of progress with drops in the standpipe pressure at constant flow rate and the fish appears to have moved upwards slightly.