Skip to main content
ins.: 2019-05-03 02:00; ( Age: 5 yrs )
By: Scientists
Category: Eger_
Eger_

Eger: 2019-05-03

After the borehole stabilization, the drilling continued on 3 May ...
typical picture of current cores

After the borehole stabilization, the drilling continued on 3 May 2019 down to 140 m. The problem of core loss seems to be overcome. But, still fractured rock...