ins.: 2021-05-19 08:14, 4 yrs ago

Category:
DOVE

DOVE: 2021-05-18
The team currently moves the drill rig, so we can post some photos of the drill site.

The team currently moves the drill rig, so we can post some photos of the drill site. Here, e.g., the 80 mm PVC pipes that were used to complete the first borehole. Above: closed pipes, below: filter pipes for sampling water later on.