ins.: 2021-04-28 08:22, 4 yrs ago

Category:
DOVE

DOVE: 2021-04-27
We made a 1:2 scale model of the borehole to date with the flush drilling samples.

We made a 1:2 scale model of the borehole to date with the flush drilling samples. Here we show it to the local hobby geologists.