ins.: 2021-09-13 09:38, 4 yrs ago

Category:
DOVE

DOVE: 2021-09-10
Basadingen site (5068-2): For the final stretch, our drilling contractor switched to a larger drill rig.

Basadingen site (5068-2): For the final stretch, our drilling contractor switched to a larger drill rig. After some down time for installation, we should be back drilling in the beginning of next week.
- Links:
- /fileadmin/icdp/projects/data/dove/2021_09_10/IOD.jpg
