ins.: 2021-06-01 19:12, 4 yrs ago

Category:
DOVE

DOVE: 2021-06-01
Tannwald: At the drill site our drilling team installed the standpipe for the second borehole.

Tannwald: At the drill site our drilling team installed the standpipe for the second borehole. The standpipe is now set at a depth of 10 m and flush drilling can commence.
Basadingen: Another successful day: we could keep up the pace and gained another 7 m to a total depth of 28 m at the end of the day.