ins.: 2021-04-21 15:32, 4 yrs ago

Category:
DOVE

DOVE: 2021-04-20
After drilling for 11 meters, the rig is now reequipped and prepared for the flush drilling!

After drilling for 11 meters, the rig is now reequipped and prepared for the flush drilling!