Skip to main content

Daily News

Project Acronym: DOVE | State: Completed | Expedition ID: 5068

ins.: 2021-06-25 08:19, 5 yrs ago
By: Scientists
Category: DOVE
DOVE

DOVE: 2021-06-24

Tannwald: After reaching the final drilling depth on Wednesday, we are currently fitting the 80mm PVC pipes into the second borehole, so it can be used for seismic measurements and water sampling.

Tannwald: After reaching the final drilling depth on Wednesday, we are currently fitting the 80mm PVC pipes into the second borehole, so it can be used for seismic measurements and water sampling.