Skip to main content
ins.: 2020-04-16 13:58; ( Age: 4 yrs )
By: scientists
Category: COSC_

COSC: 2020-04-15

The drill rig is aligned to the borehole and
The drill rig is aligned to the borehole ....

The drill rig is aligned to the borehole and preparations for installing the HWT-casing in the previously hammer-drilled upper 100 m are continuing. The microbiology lab is almost ready for operations. ICDP OSG equipment was shipped from Potsdam today (delayed due to Covid-19). If things run smoothly, we'll have all science set up when drilling operations commence.