ins.: 2020-09-09 08:50; ( Age: 5 yrs )
Category:
COSC_
COSC: 2020-09-08
After drilling has been completed last month the OSG

After drilling has been completed last month, the OSG team has now begun downhole logging in the COSC-2A borehole. After rig-up of the two logging winches, an oriented 4-arm caliper run was the first measurement over the entire length of the borehole. The borehole wall showed to be very smooth and without any bigger hole enlargements.