Skip to main content
ins.: 2014-04-25 02:00; ( Age: 10 yrs )
By: Scientists
Category: COSC1

COSC: 2014-04-25

The drill rig was placed over the cellar and conductor
Today the drill rig was brought in place over the cellar and the conductor casing (drilled last year), and the mast erected.

The drill rig was placed over the cellar and conductor casing - set up for drilling next week.