Skip to main content
ins.: 2014-04-28 02:00; ( Age: 10 yrs )
By: Scientists
Category: COSC1

COSC: 2014-04-28

Finally, the diamond core-drilling rig is exactly in place above ...
Finally, the diamond core-drilling rig is exactly in place above the conductor casing and the drillers began to install the inner casing (of the same inner dimension as the core hole) ...

Finally, the diamond core-drilling rig is exactly in place above the conductor casing and the drillers began to install the inner casing (of the same inner dimension as the core hole) in preparation for the core-drilling operations. We hope that we get started tomorrow. About 20 m of concrete plug from the cementing of the conductor casing before we will reach the bedrock.