ins.: 2014-05-01 02:00, 11 yrs ago
Category:
COSC1
COSC: 2014-05-01
The first core in the COSC drilling project was retrieved ...

The first core in the COSC drilling project was retrieved - everybody at the drill site is happy, including the drillers who battled the concrete of last year's cementing of the surface casing. Today the remaining c. 10 m of concrete above the casing shoe of the surface casing was drilled through with the inner casing. Then diamond core-drilling commenced for two core runs (3 m each) before drilling was suspended to pressure-test the surface casing and installations.
- Links:
- /fileadmin/icdp/projects/data/cosc/2014_05_01/DIS_OTHER.htm