ins.: 2014-05-22 02:00; ( Age: 10 yrs )
Category:
COSC1
COSC: 2014-05-22
We are testing the placement of Olga, the online gas ...
![](/fileadmin/icdp/projects/data/cosc1/2014_05_22/IOD.jpg)
We are testing the placement of Olga, the online gas monitoring system. This system will be used to measure potential gases transported from the borehole with the drilling fluids. So far it looks like a suitable solution. We will soon switch it on and check if it works. The drill bit wore out after only 55 m, the drill pipes were measured and seem to be deformed, and we are still waiting for adjustments to the drill rig.
- Links:
- /fileadmin/icdp/projects/data/cosc/2014_05_22/DIS_OTHER.htm