Daily News
Project Acronym: BASE | State: Completed | Expedition ID: 5069
ins.: 2022-02-21 08:26, 4 yrs ago

Category:
BASE-Moodies

BASE: 2022_02_20
The rig at Site 2A continues to drill through

The rig at Site 2A continues to drill through high-energy immature mass flows interbedded with slumped, poorly sorted sandstones. We also encountered two thin andesitic lavas.
