Skip to main content

Daily News

Project Acronym: BASE | State: Completed | Expedition ID: 5069

ins.: 2022-02-28 10:00, 4 yrs ago
By: Scientists
Category: BASE-Moodies
BASE-Moodies

BASE: 2022_02_21

The rig at Site 4B, in the middle Lomati Delta Complex, is drilling base-to-top into the base of that unit.
It has left the weathering zone and is drilling through monotonous tuffaceous cross-bedded sandstones with occasional (tidal?) bundling.

The rig at Site 4B, in the middle Lomati Delta Complex, is drilling base-to-top into the base of that unit.