Daily News
Project Acronym: BASE | State: Completed | Expedition ID: 5069
ins.: 2022-03-21 15:09, 4 yrs ago

Category:
BASE-Moodies

BASE: 2022_03_14
After drilling 367 m, the rig at site 2 has folded up and moved aside to make place for the logging vehicle.

After drilling 367 m, the rig at site 2 has folded up and moved aside to make place for the logging vehicle.
