Daily News
Project Acronym: BASE | State: Completed | Expedition ID: 5069
ins.: 2021-11-18 09:57, 4 yrs ago

Category:
BASE-Moodies

BASE: 2021_11_17
Drill hole 4A renamed from 4 1 to align

Drill hole 4A (renamed from 4-1 to align with ICDP terminology) was spudded this morning 11:40 a.m, initiating the BASE drilling campaign. We drilled 7 m of inclined borehole and recovered ca. 4 m of sandy-clayey soil. The drillers plan to set surface casing tomorrow, once they are through the soil.
