Daily News
Project Acronym: BASE | State: Completed | Expedition ID: 5069
ins.: 2022-04-25 10:37, 4 yrs ago

Category:
BASE-Moodies

BASE: 2022_04_11
The rig at Site 5 is drilling through a large slump or rotated slide block with bedding about 90° to what was expected.

The rig at Site 5 is drilling through a large slump or rotated slide block with bedding about 90° to what was expected.
