Logging operations
We performed 35 downhole logging campaigns in 21 ICDP projects in 18 countries since 1999.
We performed downhole logging at two sites of the HSPDP: Baringo & Turkana.
In the Baringo hole most of the intended logging could be carried out. A approx. 15 m long fallen down part of the upper metal casing at 185-200 m distorted the electrical & magnetic readings. The sonic log delievered only very poor results because of the generally huge borehole enlargement.
In the Turkana hole only cased hole measurements were carried out because it was not possible to pull out the casing.
Logging sections:
Baringo - 0 - 226 m
Turkana - 0 - 197 m
Tools:
Baringo - GR, SGR, MS, DLL, DIP, BS
Turkana - GR, SGR, DEVI
Staff:
Baringo - Kück, Töpfer
Turkana - Kück, Rey Abasolo
Photos HSPDP 2013