Lake Titicaca Drilling Project (LTDP)
proposed in 2000
  • Geologic age: Quaternary
  • Number of drillsites (drillholes): 3(7)
  • Drilled length: 797.0 M
  • Cored length: 625 M
  • Core recovered, length: 593.6 M
  • Core recovered length / Cored length: 94.98%
  • Core recovered / Drilled length: 74.48%
Begin Of Drilling April 26, 2001; End Of Drilling May 24, 2001
Completed
This is the preferred URL to be used in publications, citations etc.
For details, see our interactive map
Lat/Long : -16.12053, -69.12053