Lake Titicaca Drilling Project (LTDP)
proposed in 2000
  • Geologic age: Quaternary
  • Number of drillsites (drillholes): 3(7)
  • Drilled length: 797.0 M
  • Cored length: 625 M
  • Core recovered, length: 593.6 M
  • Core recovered length / Cored length: 94.98%
  • Core recovered / Drilled length: 74.48%
Begin Of Drilling April 26, 2001; End Of Drilling May 24, 2001
Completed
Repository Information: Where the rock samples are stored.
(No data returned by database query)
This is the preferred URL to be used in publications, citations etc.
For details, see our interactive map
Lat/Long : -16.12053, -69.12053