Chesapeake Bay Impact Structure Deep Drilling Project (CBAY)
proposed in 2004
  • Geologic age: Eocene
  • Number of drillsites (drillholes): 1(2)
  • Drilled length: 1806.4 M
  • Cored length: 1035.2 M
  • Core recovered, length: 873.5 M
  • Core recovered length / Cored length: 84.38%
  • Core recovered / Drilled length: 48.36%
Begin Of Drilling September 15, 2005, End Of Drilling May, 2006
Completed
Repository Information: Where the rock samples are stored.
(No data returned by database query)
For details, see our interactive map
Lat/Long : 37.3217, -75.9757