Blue Hole Drilling Project (BHDP)
Proposed in: 2008
  • Geologic age: Quaternary
  • Number of drillsites (drillholes):
  • Drilled length: M
  • Cored length: -
  • Core recovered, length: -
  • Core recovered length / Cored length: -
  • Core recovered / Drilled length: -
Workshop Successfully Done
Preliminary
Repository Information: Where the rock samples are stored. All cooperating Repositories
(No data returned by database query)
This is the preferred URL to be used in publications, citations etc.
For details, see our interactive map
Lat/Long : 17.31556, -87.53444
  • Project Link

    Project Link - Blue Hole Drilling Project

    http://bluehole.icdp-online.org/

    Please use only this URL in any kind of publication (papers, posters, flyers, citations etc.). Only this URL can be guaranteed to be persistent over coming relaunches of the Web Site.