Bighorn Basin Coring Project (BBCP) - Targeted Continental Drilling Of Paleogene Hyperthermals (BBCP)
Proposed in: 2009
  • Geologic age: Paleogene
  • Number of drillsites (drillholes): 3(6)
  • Drilled length: 921.1 M
  • Cored length: 914.3 M
  • Core recovered, length: 916.7 M
  • Core recovered length / Cored length: 100.26%
  • Core recovered / Drilled length: 99.52%
Drilling In Summer 2011
Completed
Repository Information: Where the rock samples are stored. All cooperating Repositories
For details, see our interactive map
Lat/Long : 44.4162583, -108.1055664