Geological Research Through Integrated Neoproterozoic Drilling: The Ediacaran-Cambrian Transition (GRIND)
Proposed in: 2018
  • Geologic age: Neoproterozoic
  • Number of drillsites (drillholes): 1(7) As Of 2019-Nov-18
  • Drilled length: 1862.2 M
  • Cored length: 1862.19 M
  • Core recovered, length: 1808.34 M
  • Core recovered length / Cored length: 97.11%
  • Core recovered / Drilled length: 97.11%
Workshop Done In 2014; New Workshop Proposal 2016, Not Approved; Revised Full Proposal 2017 Rejected; Revised Full Proposal 2018 Approved; Drilling In Namibia Started In September 2019
Scheduled
Repository Information: Where the rock samples are stored. All cooperating Repositories
(No data returned by database query)
For details, see our interactive map
Lat/Long : -27.40646, 16.7378