ICDP SUSTAIN Program At Surtsey (SUSTAIN)
proposed in 2015
  • Geologic age: Quaternary
  • Number of drillsites (drillholes): 1(3): 1979-Sep 4th,2017
  • Drilled length: 878.1 M
  • Cored length: 854.43 M
  • Core recovered, length: 836.93 M
  • Core recovered length / Cored length: 97.88%
  • Core recovered / Drilled length: 95.15%
Workshop Proposal Done: 2014; Workshop Successfully Done In Sep 30 To Oct 4, 2014; Full Proposal Done: Jan 2015; DIS Training Done Apr 2016; Field Campaign From July 15th To September 15th, 2017; Addendum Proposal For Additional Funds 2018; Post-drilling Workshop In May 2018 In Reykjavik
Completed
Repository Information: Where the rock samples are stored.
(No data returned by database query)
This is the preferred URL to be used in publications, citations etc.
For details, see our interactive map
Lat/Long : 63.30219, -20.61002