ICDP SUSTAIN Program At Surtsey (SUSTAIN)
proposed in 2015
  • Geologic age: Quaternary
  • Number of drillsites (drillholes): 1(3): 1979-Sep 4th,2017
  • Drilled length: 878.1 M
  • Cored length: 854.43 M
  • Core recovered, length: 836.93 M
  • Core recovered length / Cored length: 97.88%
  • Core recovered / Drilled length: 95.15%
Workshop Proposal Done: 2014; Workshop Successfully Done In Sep 30 To Oct 4, 2014; Full Proposal Done: Jan 2015; DIS Training Done Apr 2016; Field Campaign From July 15th To September 15th, 2017; Addendum Proposal For Additional Funds 2018; Post-drilling Workshop In May 2018 In Reykjavik
Completed
Repository Information: Where the rock samples are stored. All cooperating Repositories
This is the preferred URL to be used in publications, citations etc.
For details, see our interactive map
Lat/Long : 63.30219, -20.61002