The Outokumpu Deep Drilling Project (OUTO)
Proposed in: 2005
  • Geologic age: Neoproterozoic
  • Number of drillsites (drillholes):
  • Drilled length: M
  • Cored length: -
  • Core recovered, length: -
  • Core recovered length / Cored length: -
  • Core recovered / Drilled length: -
Begin Of Drilling April 2004 End Of Drilling Early 2005
Rejected
Repository Information: Where the rock samples are stored. All cooperating Repositories
(No data returned by database query)
For details, see our interactive map
Lat/Long : 62.717807, 29.061993
  • Project Link

    Project Link - Outokumpu Deep Drilling Project

    http://outokumpu.icdp-online.org

    Please use only this URL in any kind of publication (papers, posters, flyers, citations etc.). Only this URL can be guaranteed to be persistent over coming relaunches of the Web Site.

  • Public Data OUTO

    Please refresh the page to get the table below properly rendered.

    All data summarized here are preliminary working data sets, i.e. especially depths and initial descriptions may be not consistent yet through all tables.
    Data Files Last Update
    1 Downhole Logs
    Download single BHM-files
    April-2006

  • Workshops