The Outokumpu Deep Drilling Project (ODDP)
  • Geologic age: neoproterozoic
  • Number of drillsites (drillholes):
  • Drilled length: m
  • Cored length: -
  • Core recovered, length: -
  • Core recovered length / Cored length: -
  • Core recovered / Drilled length: -

Co-Operating Principal Investigators

begin of drilling April 2004 End of drilling early 2005
ongoing
Repository Information: Where the rock samples are stored.
(No data returned by database query)
62° 43' 4'' N, 29° 3' 43'' E