Campi Flegrei Caldera Deep Drilling Project (CFDDP) (CFDDP)
Proposed in: 2008
  • Geologic age: Quaternary
  • Number of drillsites (drillholes): 1(1)
  • Drilled length: 506.0 M
  • Cored length: 1 M
  • Core recovered, length: 1 M
  • Core recovered length / Cored length: 100%
  • Core recovered / Drilled length: 0.2%
Pilot Hole: Summer 2012, Main Hole: Not Determined Yet
Pending
Repository Information: Where the rock samples are stored. All cooperating Repositories
(No data returned by database query)
For details, see our interactive map
Lat/Long : 40.81164, 14.17462