Unzen Scientific Drilling Project (USDP)
Proposed in: 2001
  • Geologic age: Quaternary
  • Number of drillsites (drillholes): 1(4)
  • Drilled length: 1812.0 M
  • Cored length: 56.1 M
  • Core recovered, length: 51.7 M
  • Core recovered length / Cored length: 92.16%
  • Core recovered / Drilled length: 2.85%
Phase I: Begin Of Drilling February 17, 2003; Phase I: End Of Drilling November 13, 2003; Phase II: Begin Of Drilling May 13, 2004; Phase II: End Of Drilling July 7, 2004
Completed
Repository Information: Where the rock samples are stored. All cooperating Repositories
For details, see our interactive map
Lat/Long : 32.77, 130.32