Lake Van Drilling Project (PALEOVAN)
proposed in 2007
  • Geologic age: Quaternary
  • Number of drillsites (drillholes): 3(12)
  • Drilled length: 865.0 M
  • Cored length: 865 M
  • Core recovered, length: 522 M
  • Core recovered length / Cored length: 60.35%
  • Core recovered / Drilled length: 60.35%
Drilling Operations Started: July 2, 2010; Drilling Operations Ended: August 26, 2010
Completed
Repository Information: Where the rock samples are stored.
Lake Sediments:
For details, see our interactive map
Lat/Long : 38.748, 42.6326