Lake Van Drilling Project (PALEOVAN)
  • Geologic age: quaternary
  • Number of drillsites (drillholes): 3(12)
  • Drilled length: 865.0 m
  • Cored length: 865 m
  • Core recovered, length: 522 m
  • Core recovered length / Cored length: 60.35%
  • Core recovered / Drilled length: 60.35%
drilling operations started: July 2, 2010; drilling operations ended: August 26, 2010
completed
Repository Information: Where the rock samples are stored.
Lake Sediments:
38.748, 42.6326