The Towuti Drilling Project: Paleoenvironments, Biological Evolution, And Geomicrobiology Of A Tropical Pacific Lake (TOWUTI)
proposed in 2013
  • Geologic age: Quaternary
  • Number of drillsites (drillholes): 3(11)
  • Drilled length: 1290.3 M
  • Cored length: 1198.23 M
  • Core recovered, length: 1009.9 M
  • Core recovered length / Cored length: 84.28%
  • Core recovered / Drilled length: 78.27%

Co-Operating Principal Investigators

Workshop Done March 2012, Drilling Operations In May Until July 4th 2015
Completed
Repository Information: Where the rock samples are stored.
(No data returned by database query)
For details, see our interactive map
Lat/Long : -2.71723, 121.51479