The Towuti Drilling Project: Paleoenvironments, Biological Evolution, and Geomicrobiology of a Tropical Pacific Lake (TOWUTI)
  • Geologic age: quaternary
  • Number of drillsites (drillholes): 3(11)
  • Drilled length: 1290.3 m
  • Cored length: 1198.23 m
  • Core recovered, length: 1009.9 m
  • Core recovered length / Cored length: 84.28%
  • Core recovered / Drilled length: 78.27%
workshop done March 2012, drilling operations in May until July 4th 2015
completed
Repository Information: Where the rock samples are stored.
(No data returned by database query)
2.5° S, 121° E