Baikal Drilling Project (BDP)
Proposed in: 1997
  • Geologic age: Quaternary
  • Number of drillsites (drillholes): 1(3)
  • Drilled length: 463.8 M
  • Cored length: 156.2 M
  • Core recovered, length: 156.2 M
  • Core recovered length / Cored length: 100%
  • Core recovered / Drilled length: 33.68%
Begin In 1989; End In 1999
Completed
Repository Information: Where the rock samples are stored. All cooperating Repositories
This is the preferred URL to be used in publications, citations etc.
For details, see our interactive map
Lat/Long : 52.51805, 106.15305