Taiwan Chelungpu-fault Drilling Project (TCDP)
Proposed in: 2003
  • Geologic age: Miocene To Pliocene
  • Number of drillsites (drillholes): 1(2)
  • Drilled length: 2003.0 M
  • Cored length: 1978.83 M
  • Core recovered, length: 1489.57 M
  • Core recovered length / Cored length: 75.28%
  • Core recovered / Drilled length: 74.37%
Start: January 2004 End: December 2004
Completed
Repository Information: Where the rock samples are stored. All cooperating Repositories
For details, see our interactive map
Lat/Long : 24.1983, 120.752