Project meta data

Drilling Into Seismogenic Zones Of M2.0 – M5.5 Earthquakes In Deep South African Gold Mines (DSEIS)
proposed in 2016
  • Geologic age: Archean
  • Number of drillsites (drillholes): 2(4) 2018-Jun-22
  • Drilled length: 1718.0 M
  • Cored length: 1718 M
  • Core recovered, length: 1632.62 M
  • Core recovered length / Cored length: 95.03%
  • Core recovered / Drilled length: 95.03%

Co-Operating Principal Investigators

Workshop Proposal Done: Jan 2015; Workshop Proposal Approved, Planned For 31 Oct To 3 Nov 2015 In Johannesburg; New Drilling Proposal 2016, Approved; Drilling Commenced In June 2017 And Will End In June 2018
Ongoing
Repository Information: Where the rock samples are stored.
(No data returned by database query)
This is the preferred URL to be used in publications, citations etc.
For details, see our interactive map
Lat/Long : -26.41611, 27.42722