Lake Bosumtwi Drilling Project (BCDP)
  • Geologic age: quaternary
  • Number of drillsites (drillholes): 8(8)
  • Drilled length: 428.1 m
  • Cored length: 430.76 m
  • Core recovered, length: 338.95 m
  • Cored length / Total length ratio: 78.69%
  • Core recovered / Total length ratio: 79.17%
phase I: sediment coring; begin of drilling July 8, 2004; end of drilling August 8, 2004; phase II: impact rock coring; begin of drilling September 17, 2004; end of drilling October 5, 2004
completed
Repository Information: Where the rock samples are stored.
(No data returned by database query)
This is the preferred URL to be used in publications, citations etc.
6° 30' N, 1° 25' W