Lake Bosumtwi Drilling Project (BCDP)
proposed in 2002
  • Geologic age: Quaternary
  • Number of drillsites (drillholes): 8(8)
  • Drilled length: 428.1 M
  • Cored length: 430.76 M
  • Core recovered, length: 338.95 M
  • Core recovered length / Cored length: 78.69%
  • Core recovered / Drilled length: 79.17%
Phase I: Sediment Coring; Begin Of Drilling July 8, 2004; End Of Drilling August 8, 2004; Phase II: Impact Rock Coring; Begin Of Drilling September 17, 2004; End Of Drilling October 5, 2004
Completed
Repository Information: Where the rock samples are stored.
(No data returned by database query)
This is the preferred URL to be used in publications, citations etc.
For details, see our interactive map
Lat/Long : 6.52227, -1.42097