The Bushveld Complex Drilling Project (BVDP)
Proposed in: 2019
  • Geologic age: Mid-paleozoic
  • Number of drillsites (drillholes):
  • Drilled length: M
  • Cored length: -
  • Core recovered, length: -
  • Core recovered length / Cored length: -
  • Core recovered / Drilled length: -
Workshop Proposal 2013 Approved; Workshop Done 2014; New Full Proposal 2017 Not Approved; Revised Full Proposal 2018 Not Approved; Revised Full Proposal 2019 Approved
Pending
Repository Information: Where the rock samples are stored. All cooperating Repositories
(No data returned by database query)
    (No data returned by database query)
This is the preferred URL to be used in publications, citations etc.
For details, see our interactive map
Lat/Long : -24.00000, 28.00000