Afar Dallol Drilling - ONset Of Sedimentary Processes In An Active Rift Basin (ADD-ON) ()
Proposed in: 2020
  • Geologic age: N.a.
  • Number of drillsites (drillholes):
  • Drilled length: M
  • Cored length: -
  • Core recovered, length: -
  • Core recovered length / Cored length: -
  • Core recovered / Drilled length: -
    (No data returned by database query)
(No data returned by database query)
First Workshop Proposal 2020 Approved
Approved
Repository Information: Where the rock samples are stored. All cooperating Repositories
(No data returned by database query)
This is the preferred URL to be used in publications, citations etc.
For details, see our interactive map
Lat/Long : 14.208621, 40.315171
  • Project Link

    Project Link -Afar Dallol Drilling, Ethiopia

    http://addon.icdp-online.org

    Please use only this URL in any kind of publication (papers, posters, flyers, citations etc.). Only this URL can be guaranteed to be persistent over coming relaunches of the Web Site.

  • Workshops
    First online ICDP workshop on Afar Dallol Drilling
    online
    on June 29-30, 2021
    ---Announcement


    Second ICDP workshop on Afar Dallol Drilling
    Addis Abeba (Ethiopia)
    on January 10-14, 2022