Skip to main content

Daily News

Project Acronym: SAFOD | State: Completed | Expedition ID: 5025

ins.: 2022-10-06 12:17, 3 yrs ago
By: sql
Category: SAFOD
SAFOD

SAFOD: 2007-07-11

The rotary drilled section for corehole 1 was successfully
Derrickman Bobby Williforo preparing to trip out.

The rotary drilled section for corehole 1 was successfully completed today. This hole parallels the main hole drilled in 2005 and is offset by approximately 10 meters. After tripping out, a reaming assembly will be run in the hole in preparation for installation of the 5 inch casing needed to support the coring system.