Daily News
Project Acronym: SAFOD | State: Completed | Expedition ID: 5025
ins.: 2022-10-06 12:17, 3 yrs ago

Category:
SAFOD

SAFOD: 2007-07-11
The rotary drilled section for corehole 1 was successfully

The rotary drilled section for corehole 1 was successfully completed today. This hole parallels the main hole drilled in 2005 and is offset by approximately 10 meters. After tripping out, a reaming assembly will be run in the hole in preparation for installation of the 5 inch casing needed to support the coring system.
- Links:
- https://