Skip to main content

Daily News

Project Acronym: SAFOD | State: Completed | Expedition ID: 5025

ins.: 2022-10-06 12:17; ( Age: 2 yrs )
By: sql
Category: SAFOD
SAFOD

SAFOD: 2005-08-12

The first pipe conveyed logging run is underway and
Foreman Randy Burke lends a hand on the rigfloor as the pipe conveyed logging tools are lowered into the hole for the first run.

The first pipe conveyed logging run is underway and a preliminary look at the data indicates that the data from this run correlates very well with the LWD data obtained during drilling.