Skip to main content

Daily News

Project Acronym: SAFOD | State: Completed | Expedition ID: 5025

ins.: 2022-10-06 12:17; ( Age: 3 yrs )
By: sql
Category: SAFOD
SAFOD

SAFOD: 2004-09-21

Preparations continue for casing the well when geophysical logging
Preparations continue to case the well when logging is completed.

Preparations continue for casing the well when geophysical logging is complete. Today, a resistivity log was obtained to the bottom of the hole using a pipe-deployed sonde (logging down). While carrying out a multi-component sonic log (logging up), the measurements were terminated after ~ 400m due to a problem with the logging cable. New cable has been brought to the site and the logging program continues..