Skip to main content

Daily News

Project Acronym: SAFOD | State: Completed | Expedition ID: 5025

ins.: 2022-10-06 12:17; ( Age: 2 yrs )
By: sql
Category: SAFOD
SAFOD

SAFOD: 2004-08-01

Life on the SAFOD drill site is pretty quiet
There is 2760 ft of casing in front of the rig that will case the borehole from 1978 ft to 4740 ft.

Life on the SAFOD drill site is pretty quiet today as we wait for the 13.375"" diameter casing to be lowered into the borehole and cemented in place.