Skip to main content

Daily News

Project Acronym: SAFOD | State: Completed | Expedition ID: 5025

ins.: 2022-10-06 12:17; ( Age: 3 yrs )
By: sql
Category: SAFOD
SAFOD

SAFOD: 2004-07-18

Today addtional gyroscopic hole surveys were run in the
A gyroscopic directional survey is run in the pilot hole to determine its true trajectory.

Today addtional gyroscopic hole surveys were run in the pilot hole and the main hole. A cement plug was set between the bridge plug (3550 ft) and the kick off point (3175 ft) in preparation for sidetracking the main hole away from the pilot hole.