Skip to main content

Daily News

Project Acronym: SAFOD | State: Completed | Expedition ID: 5025

ins.: 2022-10-06 12:17; ( Age: 2 yrs )
By: sql
Category: SAFOD
SAFOD

SAFOD: 2004-06-15

The drilling crew works around the clock to replace
The old top-drive is disconnected and hoisted down to the ground with a crane before the new top-drive is put in place.

The drilling crew works around the clock to replace the top-drive as temperatures soar to over 100 degrees Fahrenheit.