Skip to main content

Daily News

Project Acronym: SAFOD | State: Completed | Expedition ID: 5025

ins.: 2022-10-06 12:17; ( Age: 2 yrs )
By: sql
Category: SAFOD
SAFOD

SAFOD: 2002-07-23

After laying down the last of the coring pipe
Willie Davison (Geospace) and Tom Burdette (USGS) examining the multi-channel seismic recording system.

After laying down the last of the coring pipe the seismic team from Duke University (led by Peter Malin) is preparing to install the downhole seismic array by the light of the full moon.