Daily News
Project Acronym: SAFOD | State: Completed | Expedition ID: 5025
ins.: 2022-10-06 12:17, 3 yrs ago

Category:
SAFOD

SAFOD: 2002-07-16
After a 14 hour fishing operation the wireline was

After a 14 hour fishing operation, the wireline was successfully removed from the hole although the temperature probe is still on bottom and will be drilled out later.
- Links:
- https://