ins.: 2022-07-25 14:04, 3 yrs ago

Category:
GRIND_

GRIND: 2022-06-06
Installing the drilling rig in the new site Site 3B with NW-dipping Tamengo carbonate beds in the background.

Installing the drilling rig in the new site Site 3B with NW-dipping Tamengo carbonate beds in the background. This drill hole will be inclined to cross the beds nearly perpendicular to the bedding plane.