Skip to main content

Daily News

Project Acronym: IDDP-1 | State: Completed | Expedition ID: 5029

ins.: 2009-06-08 02:00; ( Age: 15 yrs )
By: Scientists
Category: IDDP_
IDDP_

IDDP: 2009-06-08

Drilling in rock started at 6:30 pm yesterday and this ...
The temperature probe was lowered into the drill string at 12h.

Drilling in rock started at 6:30 pm yesterday and this morning at 5:30 am the depth was 2103.8 m. LOC had been increasing and finally complete from 2076 m. When 2103.8 m were reached, it was decided to POOH but when one drillpipe had been removed this morning at about 7 am the string got stuck. At that point the drill bit was at 2090 m. Attempts are now being made to get the string unstuck.