Skip to main content

Daily News

Project Acronym: IDDP-1 | State: Completed | Expedition ID: 5029

ins.: 2009-06-15 02:00; ( Age: 15 yrs )
By: Scientists
Category: IDDP_
IDDP_

IDDP: 2009-06-15

The crew cemented on top of fish last night with ...
Pulling out after successfully laying down a cement-plug.

The crew cemented on top of fish last night with string at 2050 m depth. Volume of cement for plug was 14 m3. After cementing TOC was at 1998 m depth. After laying down the plug the driller pulled back and checked for loss of circulation, there were no losses. Laying down a second plug was completed before lunch. A total of 6,3 m3 were pumped into the well. This should suffice to put TOC 20 m above the shoe. Putting together a string for sidetrack will commence later today or tonight.